SHOPPING CENTER
ALFAJR – QATAR
Disciplines: Specifics:
1. Structure
2. Architecture
Area: 14800 m2
Location: Qatar, Alfajr
Project Duration: 1 months
Date: 2019



MECHANICAL ROOM
QATAR
Disciplines: Specifics:
1. Structure
2. Architecture
3. Plumbing
4. Mechanical
Area: 2000 m2
Location: Qatar
Project Duration: 1 months
Date: 2019



HVAC MECHANICAL ROOM
IRANMALL
Disciplines: Specifics:
1. Structure Area: 7000 m2
2. Mechanical Location: Tehran, District 22 – Iran mall
3. Plumbing Project Duration: 4 months
4. Electrical Date: 2019




ICE BANK SYSTEM
IRANMALL
Disciplines: Specifics:
1. Structure Area: 4000 m2
2. Mechanical Location: Tehran, District 22 – Iran mall
3. Plumbing Project Duration: 4 months
4. Electrical Date: 2019



HVAC RAIZER
IRANMALL
Disciplines: Specifics:
1. Structure Pipe: 56” x 2 – 24” x 4
2. Mechanical Location: Tehran, District 22 – Iran mall
3. Plumbing Project Duration: 4 months
4. Electrical Date: 2019



ASEFI BUILDING
TEHRAN – IRAN
Disciplines: Specifics:
1. Structure
2. Architecture
3. Mechanical
4. Plumbing
NUM of Parking Level: 3
NUM of Residential Level: 8
Area: 6500 m2
Location: Tehran, District 1–Asefi Street
Project Duration: 8 months
Date: 2017



ARASH BUILDING
TEHRAN – IRAN
Disciplines: Specifics:
5. Mechanical
6. Plumbing
NUM of Parking Level: 5
NUM of Residential Level: 11
Area: 18000 m2
Location: Tehran, District 1–Zaferanieh
Project Duration: 8 months
Date: 2016



ARASH BUILDING
TEHRAN – IRAN
Disciplines: Specifics:
5. Mechanical
6. Plumbing
NUM of Parking Level: 5
NUM of Residential Level: 11
Area: 18000 m2
Location: Tehran, District 1–Zaferanieh
Project Duration: 8 months
Date: 2016



DARRUS BUILDING
TEHRAN – IRAN
Disciplines: Specifics:
1. Mechanical
2. Plumbing
NUM of Parking Level: 3
NUM of Residential Level: 9
Area: 22800 m2
Location: Tehran, District 1–Zaferanieh
Project Duration: 8 months
Date: 2016



HVAC MECANICAL ROOM
ELEAHIEH – IRAN
Disciplines: Specifics:
1. Mechanical
2. Plumbing
Area: – m2
Location: Tehran, District 1–Elahieh
Project Duration: 2 months
Date: 2016



STRUCTURE
NOBONYAD – IRAN
Disciplines: Specifics:
1. Structure NUM of Parking Level: 4
NUM of Residential Level: 12
Area: 60000 m2
Location: Tehran, District 3–Nobonyad
Project Duration: 4 months
Date: 2016

